Fire Rebuild & Reconstruction in Burbank
Fire-damaged house in Burbank? Cedarline Design Build draws, permits and builds the replacement, planning the roof and runoff so water stays out of the shell.
Between the day framing starts and the day the roof is dried in, a rebuilt house has only its schedule to protect it from a hard storm. On a Burbank fire rebuild we plan around that gap, putting the roof deck, underlayment and window flashing ahead of interior work and deciding where runoff leaves the lot before any footing is formed. The new house stays dry because the water path was drawn first.
Closing the shell early
Roof sheathing goes on with its underlayment in the same push, and window and door openings are flashed in lapped layers so each piece sheds onto the one below. Where the frame has to stand open for a time, we cover exposed plates and stem walls so lumber does not soak. The roof covering is a fire-rated assembly, and gutters and leaders are metal, which holds up to ember exposure better than vinyl and gives a fire nothing to burn at the eave. Drywall, wiring and the other interior trades start after the roof is dried in.
Carrying runoff away
A cleared lot with its plants gone sheds rain faster than it used to, so grading is set to carry water away from the slab and toward a planned outlet. Downspouts discharge at a distance from the footing, and a swale or a drain behind the wall may be needed if the lot falls toward the house. The city building department reviews drainage notes along with the structure, so the grading plan goes into the permit set from the start and is settled on paper before anyone digs.
Fire Rebuild & Reconstruction in Burbank: common questions
It often can. When Burbank's accessory unit rules permit another building on the lot, the second unit can ride through plan review with the main house. We read the current rules when drawing begins, show what fits, and size the utility connections for both.
Which rules apply depends on the address, because a parcel may or may not sit inside a mapped fire hazard zone. Ask the city building department, or let us look it up. A mapped lot calls for vents that keep embers out, siding that resists ignition low on the house and a fire-rated roof. An unmapped lot follows the current state code.
Debris removal runs through its own process, so drawing can go ahead while crews work. We begin the plans and the scope during cleanup, then hold construction until the site is released and the Burbank building department has issued the permit.