New Construction in Canoga Park

New Canoga Park houses priced after we measure how far the lot falls to the street, so sewer and drains flow by gravity, with an ADU placed to match.

Ask for a lot review

By sending, you agree Cedarline Design Build may contact you by call, automated text or email about your request. Consent isn't required to buy. Msg & data rates may apply; reply STOP to opt out. Privacy Policy

How far the ground falls from the back fence to the street gutter is the reading we take first on a Canoga Park lot, using a builder's level and a rod. That figure tells us whether roof water and the sewer line can flow out by gravity, or whether the floor needs to sit higher or a pump has to be added. A backyard ADU depends on it most, since its drains have the longest run.

What the reading decides

Sewage and storm water both need a steady slope to move without help. If the lot is flat or falls toward the back, the line from a rear ADU may be too long to keep that slope and still meet the main at the street. Then the choices are raising the unit's floor, moving it forward or adding a small ejector pump with an alarm. Roof drains follow the same logic, and the site plan shows each route with its fall before any price is set.

Other early measurements

Along with the fall, we measure the street frontage, find the property corners and note where the water meter and power connection sit. Those points let the survey and soils work start with a clear picture of the lot. LADBS reviews the site plan, grading and stormwater sheets with the structure and energy forms, so the drainage choices made from that first reading carry through to plan check. An ADU on the same submittal is reviewed with its own sewer route shown.

About New ConstructionAll services in Canoga Park

New Construction in Canoga Park: common questions

More we build in Canoga Park

Start your new construction in Canoga Park

Tell us about the property and the project. We reply with what it involves and how we would price it.