New Construction in Lakewood
Lakewood new houses laid out with an ADU against the setbacks on the first visit, then surveyed, engineered and taken through city plan review.
"How much yard is left once a house and a backyard unit both fit?" We answer that on the first visit to a Lakewood lot by measuring the parcel and sketching both footprints against the setbacks zoning allows. The answer shapes everything after it: the size of each building, where the driveway runs, and whether the unit sits behind the garage or along a side line.
Measuring the lot for two buildings
A tape and a site sketch come before any drawing. We note the lot width and depth, existing trees, the sewer cleanout, where the electric service enters and any easement on the title report. Zoning sets the house setbacks and lot coverage, and state ADU law limits how far a detached unit has to stay from the side and rear lines. With those lines on paper, we can show how much open ground the plan leaves for a patio, planting and a clear walk to the unit's door.
From sketch to permit
Once the layout works, a licensed surveyor confirms the lines and a soils engineer reports on bearing capacity and any expansive clay. The architect develops both buildings, the structural engineer designs foundations and shear walls, and the energy consultant models insulation, windows and the rooftop solar a new home needs. The building department serving Lakewood then checks the set for zoning, structure, energy and green building items. On an inland lot, light-colored roofing and generous attic insulation help both buildings stay comfortable through hard sun.
New Construction in Lakewood: common questions
Lakewood lots that can hold a second dwelling under zoning are worth planning with both buildings on one sheet. Shared trenches for sewer, water and power, one grading plan and a driveway that serves both cost less than adding the unit to a finished site, and privacy between the two is designed in.
Measurements and a feasibility sketch lead, followed by a property survey, a soils study and full drawings. The city's plan reviewers go through it, and corrections go back and forth until approval. Wrecking an existing house takes a permit of its own and a utility cutoff, and the excavator arrives after the building permit.
Lakewood construction is judged against the California Residential Code, the energy standards and CALGreen, as adopted for the city. Zoning fixes height, setbacks and coverage for the house, while state ADU law and the city's own provisions set the size and placement of a second unit on the same lot.
More we build in Lakewood
Start your new construction in Lakewood
Tell us about the property and the project. We reply with what it involves and how we would price it.

