New Construction in Monterey Park
Monterey Park new houses with permeable pavers, a cool roof and glass shaded by orientation, plus an ADU tied into the same drainage and material plan.
On an inland lot the driveway meets the odd hard storm and long stretches of hard sun before anything else does, so permeable concrete pavers in a pale tone are the surface we propose for a new Monterey Park house. Rain drains through the joints into a crushed rock bed and stays off the garage slab, and the light face holds less heat than dark asphalt. The same pavers can lead to an ADU door and join one drainage plan.
Roof, glass and walls for an inland lot
Above the paving, a pale roof covering with a cool rating sits over either a vented attic or a sealed deck that keeps ductwork inside the conditioned space. Glass that faces the high midday sun is shaded by an overhang sized to cut it off. Glass that takes the low sun of late afternoon gets a low solar heat gain coating plus exterior vertical screens or fins, since a horizontal projection misses that angle. A heat pump covers heating and cooling, and street-side bedrooms can take a second layer of drywall for quiet. Each product appears on the plans and in the energy forms.
Plan check and the second unit
Monterey Park plan check looks at the site plan, framing, energy compliance and CALGreen, including how stormwater leaves the parcel. Should the lot slope, grading and any retaining walls are drawn on separate sheets. An ADU planned alongside the house can repeat its paving, roof and window specifications, and a single trench brings it sewer, water and power. Where a house already stands, the utility companies end service first, a demolition permit covers the teardown, and debris leaves the lot before the new footings are laid out.
New Construction in Monterey Park: common questions
Placing an ADU in the first Monterey Park drawings lets the pavers, driveway and drainage reach both front doors without tearing anything up later. Zoning has to allow the unit on that parcel. Both buildings can share one trench and one material list while their windows and outdoor spaces stay apart.
Field work comes first: a boundary survey and borings taken for the geotechnical report. The architect then draws the house, and consultants add the structural design and the energy calculations. City reviewers send back comments, which are answered before the permit issues. Any existing house is disconnected and demolished with its own permit, and excavation starts after that.
The city adopts the California Residential Code, the Energy Code and CALGreen, sometimes amending parts of them. Monterey Park zoning sets height, setbacks and lot coverage. Stormwater requirements shape how much of the lot can be paved solid and where runoff goes, and a second unit answers to state ADU law plus the city's own ADU provisions.
New Construction in other cities
More we build in Monterey Park
Start your new construction in Monterey Park
Tell us about the property and the project. We reply with what it involves and how we would price it.

