New Construction in Studio City
Studio City houses designed and built with the main house and an ADU planned to share an electrical service where the rules allow.
Can the house and the ADU share one electric service? It is a good question for the first visit to a Studio City lot, because the answer changes the panel size, the meter location and the trench route. Some designs run a single service with a subpanel, while others call for a second meter. The utility and the city decide, and we find out before the plans are drawn.
Sizing power for 2 buildings
A modern house with electric cooking, heat pumps and a car charger carries a heavier load than one designed to older assumptions, and an ADU adds its own demand. The electrical engineer runs a load calculation for both buildings and compares it to the service capacity. If it does not fit, the options are a larger service, a separate meter for the unit or load management on the larger appliances. Panel locations get chosen with clearance rules in mind, so nothing ends up behind a closet door.
The LADBS submittal
Studio City lies within the City of Los Angeles, so LADBS reviews the set. Electrical sheets show the service size, panel schedules and the load calculation, and plan check compares them with the architectural plans. Structural, energy and grading sheets complete the package. Utility coordination begins early, since the power provider's own requirements apply on top of the city's. Energy forms record the heat pump and water heater specifications, which feed the load numbers. Panel schedules list every circuit, so the reviewer can see where the unit's loads land.
New Construction in Studio City: common questions
Often a clean way to plan, when the lot qualifies. Drawing the unit early lets one site plan carry its electrical, water and sewer connections along with the house, and any rule that limits its size or location surfaces while changes are easy.
The LADBS permit set comes after survey, soils work, design and engineering. Demolition of an existing house needs a permit and utility disconnects. Coordination for the new service runs alongside. Footings are dug after approval.
The electrical code governs service and panels, while energy and green standards apply to every new house in California. Zoning rules limit height and setbacks and set parking. Earthwork falls under grading and stormwater rules, and ADU law applies to any second unit.
New Construction in other cities
More we build in Studio City
Start your new construction in Studio City
Tell us about the property and the project. We reply with what it involves and how we would price it.

