New Construction in Sylmar
Sylmar houses with ember-resistant walls, roofs and vents drawn in from the start, and an ADU built to the same details where the lot allows.
Cement plaster over metal lath and fire-rated gypsum sheathing is the wall assembly we put forward first for a new Sylmar house. Mapped fire hazard zones cover some Sylmar addresses, and ember-resistant exteriors may be required there, and plaster is mineral, so a drifting ember finds nothing to burn. Hard sun and dry wind leave it alone as well.
Vents, eaves and the other weak points
Walls are only part of an ember defense. Attic and crawlspace vents get fine metal mesh or a listed ember-resistant vent, eaves are boxed in with noncombustible or ignition-resistant material, and gutters take a metal guard so debris cannot pile up. Windows get tempered dual-pane glass. A wood fence that touches the house is a quiet fuse, so the plan can end the wood at a short metal section or a masonry return. All of it is drawn into the set the plan checker reads.
Inland sun and the finish coat
Integral color tints the plaster all the way through, so a chip or scrape shows the same shade underneath. Hard inland sun fades paint rolled over a patched surface sooner than it dulls a tinted coat, and control joints are laid out at plan stage so shrinkage cracks follow a designed line. Where an ADU shares the lot, matching its wall assembly to the main house keeps one set of details and one inspection path. Samples go on the lot so the color can be judged in real light.
New Construction in Sylmar: common questions
Where the lot meets ADU rules, giving the unit the same cladding, roof class and defensible-space plan as the house makes review simpler. Ember-resistant details get drawn a single time. Lot size and setbacks decide whether a unit fits at all.
Surveying and soils work open the job, then engineering, a fire-resistance read for mapped lots and plan check. Where a house is coming down, a teardown permit and service shutoffs precede digging. Concrete is poured once the permit is in hand.
Wall, roof and window choices answer to the energy standards and the structural provisions, while zoning frames the building envelope. Where a lot is mapped as a fire hazard zone, wildfire construction provisions govern exterior materials, vents and glazing. An accessory unit also meets state and city ADU requirements.
New Construction in other cities
More we build in Sylmar
Start your new construction in Sylmar
Tell us about the property and the project. We reply with what it involves and how we would price it.

