New Construction in Lake Balboa
Lake Balboa new houses laid out ADU first, then surveyed, engineered and taken through LADBS plan check with shared trenches and one grading plan.
On a Lake Balboa parcel, we fix where the backyard unit will stand before the main house gets a footprint, because the unit's setbacks and its path to the street are the tighter constraint. Once both outlines are pinned down, the survey and soils report confirm them, and the set moves on to engineering and then LADBS. Working in that order keeps the trench routes, the driveway and the yard from being redrawn.
Fixing both footprints
State ADU law caps how far a detached unit must stay from the side and rear lines, and the City of Los Angeles code adds its own limits on height and spacing from the main house. We sketch the unit against those lines first, then fit the house, the driveway and the yard around it. Fire access, a clear walk from the curb to the unit's door, and the sewer route are traced on the same sheet. If the lot is flat, swales between the two buildings are easy to lay out, and on a lot with fall the grading plan sets which way each pad sheds water.
Engineering and plan check
With the layout fixed, the structural engineer designs foundations from the soils report and sizes the lateral system, shear walls or a steel frame where wide openings need one. The energy consultant models the envelope, the heating and cooling equipment and the rooftop solar the state requires on a new house. LADBS then reads the house and ADU drawings for zoning, structure, energy and stormwater, and corrections are answered sheet by sheet. Demolition of an older house on the lot proceeds on its own permit after the utility companies cut service at the street.
New Construction in Lake Balboa: common questions
Drawing the unit before the house is how we lay out a Lake Balboa lot when zoning permits one. It gets the setbacks and street access it needs, and the main house takes the remaining room. A single utility trench, sewer plan and grading plan then serve both buildings, which is simpler to build than a retrofit.
Field work produces a surveyed map of lines and grades and a geotechnical report. The layout, structural design and energy model go into one set for plan check, and each correction is answered before approval. Any house already on the parcel is demolished under a separate permit, and the foundation crew mobilizes once the permit card is issued.
LADBS applies the Los Angeles building code to a Lake Balboa house, which adopts the state residential and green codes with city amendments, plus the state energy standards. City zoning sets the height, setbacks and floor area for the house, and state ADU law with the city's own provisions governs the second unit.
New Construction in other cities
More we build in Lake Balboa
Start your new construction in Lake Balboa
Tell us about the property and the project. We reply with what it involves and how we would price it.

