New Construction in North Hills

Keeping water away from a new house in North Hills: clearance at the base of the walls, grade, and drainage planned alongside an ADU.

Ask for a lot review

By sending, you agree Cedarline Design Build may contact you by call, automated text or email about your request. Consent isn't required to buy. Msg & data rates may apply; reply STOP to opt out. Privacy Policy

Stucco has to stop above the ground. Code asks the weep screed at the bottom of a plaster wall to sit at least 4 inches above bare earth and 2 inches above paving, so water has room to drain and the wall base stays dry. On a new North Hills house that clearance decides the finished grade around the whole building, and it carries over to an ADU on the lot.

Setting the grade around the walls

A bed of soil piled against plaster wicks moisture upward and lets pests reach the framing. The grading plan keeps soil and paving below the weep screed line and slopes the ground away from the walls. Concrete walkways and patios are set to fall away from the doors. Planting beds are shaped so irrigation water leaves them without running toward the foundation. Getting these levels right at the start takes a few lines on a drawing, while fixing them after landscaping tears up finished work.

Doors, thresholds and the ADU

The lowest openings in a house, often the patio doors, are where water finds its way in most easily. Thresholds are set with a pan and a sloped sill, and the concrete outside falls away from them. An ADU follows the same rules, and its floor height is chosen so water from the yard cannot reach the entry. LADBS reviews the grading and drainage on the plot plan, and a stormwater requirement may call for runoff to be handled on the lot.

About New ConstructionAll services in North Hills

New Construction in North Hills: common questions

More we build in North Hills

Start your new construction in North Hills

Tell us about the property and the project. We reply with what it involves and how we would price it.