New Construction in Van Nuys
Van Nuys construction that reads the existing electrical service before design, so a second unit can be planned in with confidence.
The rating plate on the main panel tells us more about a Van Nuys lot than its appearance does. Service amperage, the meter's age and the conductor size show how much a new house and an ADU can draw before the utility has to upgrade anything. We read that plate on the first walk and photograph it, because it frames the electrical plan and the trench route.
What the panel reading changes
A service sized for an older, smaller house may not carry a new house with modern loads, let alone an ADU. If the numbers are short, the plan allows for a larger service, a new meter location or a second meter for the unit. Each choice moves something on the site: the meter wall, the trench path, the place for the panel. Finding the answer before the design is final keeps electrical changes from forcing a layout change later. Photographs of the plate go into the file, so the numbers can be checked later.
The LADBS review in Van Nuys
Van Nuys is a part of the City of Los Angeles, so LADBS reviews a new house here. Plan check compares the service size on the electrical sheets with the load calculation, then checks structure, energy forms, grading and the separate-dwelling requirements for an ADU. The power provider has its own requirements for service and meter placement, and we gather them while the site plan is still open to change. Trench routes are drawn from the panel to the unit so inspectors see the whole path.
New Construction in Van Nuys: common questions
The answer is yes if the lot qualifies. A unit planned with the house can be sized into the electrical service from the start, and its water and sewer connections can be run in the same trench. State and city rules set the size and height limits.
The work starts with a survey, soils testing and a reading of the existing service. Design, engineering and a permit submittal follow. If an older house is being replaced, demolition needs a permit and the utilities have to be disconnected. Footings come after approval.
Service and panels follow the electrical code, and the rest of the house follows California's structural, energy and green requirements. Zoning covers the building envelope and parking. Site drainage follows the stormwater rules, and an ADU follows state ADU law together with city standards.
New Construction in other cities
More we build in Van Nuys
Start your new construction in Van Nuys
Tell us about the property and the project. We reply with what it involves and how we would price it.

